© 2008 Keating Fire Company


September 21
Stations 252, 249, 250 were dispatched to a reported structure fire on Bellevue Road. Assistant Chief 252 (M. E. Ford) Arrived on the scene to find a working structure fire.
252 Engine arrived first on the scene and attacked the fire with an 1 ¾. Crews worked
to bring the fire under control, while EMS transported 1 patient to the Hospital
for Observation. During the fire Stations 297-
Thanks to all for the help.


July 1
After midnight Stations 246, 253 and 251 RIT were alerted for a Commercial Structure
Fire on Babcock Bvld. Police Arrived on the scene shortly there after to find heavy
smoke from all four sides of the building. A short time later 251 Chief (Gross) and
510 FM-
252 Engine Responded with 6 and assisted with the Defensive Attack on the fire and overhaul was after the fire had been knocked down.

May 7
Shortly before midnight Stations 249, 252, 297 -
249 Chief (Glinski) arrived on the scene and established command. 252 Engine Responded with 7 and assisted in making with the initial Defensive Attack on the fire and continued with overhaul after the fire had been knocked down.
All personnel left the fire muddy and tired from a hard nights work.